2012/08/15 by Dey, J., Kourbanis, I.
#Accelerator Physics (physics.acc-ph) #FOS: Physical sciences
paper · doi:10.48550/arxiv.1208.3218
For Project X Fermilab Main Injector will be required to provide up to 2.3 MW to a neutrino production target at energies between 60 and 120 GeV. To accomplish the above power levels 3 times the current beam intensity will need to be accelerated. In addition the injection energy of Main Injector will need to be as low as 6 GeV. The current 30 year old Main Injector radio frequency system will not be able to provide the required power and a new system will be required. The specifications of the new system will be described.