vix.ing · top · new · best · stats · spec

Status and specifications of a Project X front-end accelerator test facility at Fermilab

2012/08/16 by J. Steimel, Steimel, J., R. Webber +9
Physics and Astronomy · #Accelerator Physics (physics.acc-ph) #FOS: Physical sciences #physics.acc-ph

paper · pdf · doi:10.48550/arxiv.1208.3409

3 pp. Particle Accelerator, 24th Conference (PAC'11) 2011. 28 Mar - 1 Apr 2011. New York, USA

arxiv created 2012/08/16 · arxiv updated 2012/08/17

Abstract

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility.

Related