vix.ing · top · new · best · stats · spec

A gap clearing kicker for Main Injector

2012/08/16 by I. Kourbanis, P. Adamson, Kourbanis, I. +23
Engineering · Physics and Astronomy · #Accelerator Physics (physics.acc-ph) #FOS: Physical sciences #Gyrotron and Vacuum Electronics Research #Particle Accelerators and Free-Electron Lasers #Particle accelerators and beam dynamics

paper · pdf · doi:10.48550/arxiv.1208.3414

openalex publication_date 2012/08/16 · openalex created_date 2025/10/10 · openalex updated_date 2026/07/28

Abstract

Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.

Related