vix.ing · top · new · best · stats · spec

Final assessment of radioactive impurities in the JUNO detector

2026/07/20 by Thomas Adam, Fengpeng An, Costas Andreopoulos +569
#physics.ins-det #hep-ex

paper · pdf

Abstract

The Jiangmen Underground Neutrino Observatory (JUNO) collaboration has completed the construction of the 20,000-ton liquid scintillator detector and the associated muon veto detector system. To meet the physics objectives, the materials used in the detector must exhibit low radioactive contamination. The single-event rate in the fiducial volume (R < 17.2 m) of the scintillator is required to be approximately 7 Hz for energies above 0.7 MeV, resulting in an accidental coincidence background of about 1 event per day for reactor neutrino physics analyses. Since the beginning of the construction phase, we have screened the natural radioactivity content of thousands of materials, to select those that meet the design background budget. The radioactive impurity concentrations of the materials ultimately used in the JUNO detector are summarized in this paper. The construction of the entire detector and the subsequent filling of the liquid scintillator were completed in August 2025. From the initial data, the total count rate of natural radioactivity within the detector's fiducial volume has met the requirements and is sufficient to support the reactor antineutrino analysis.

Related