2000/08/08 by O. K. Belyaev, O. V. Ershov, I. G. Maltsev +4
Physics and Astronomy · #physics.acc-ph
published as eConf C000821 (2000) MOD21 · 3 pages, 7 figures, LINAC2000 Conference, PDF format
arxiv created 2000/08/08 · arxiv updated 2009/12/01
The new 1.8 MeV proton RFQ was completed and started operation in the IHEP in 1997. It was built according to the plan of modernization of the injection system to the booster of the IHEP proton synchrotron.