vix.ing · top · new · best · stats · spec

Optimal Operation of HVDC Interconnector: Irish Case

2022/08/06 by Md Umar Hashmi, Hashmi, Md Umar
Energy · #FOS: Electrical engineering #Renewable energy and sustainable power systems #Systems and Control (eess.SY) #electronic engineering #information engineering

paper · doi:10.48550/arxiv.2208.03593

openalex publication_date 2022/08/06 · openalex created_date 2025/10/10 · openalex updated_date 2026/07/28

Abstract

In September 2018 EirGrid launched the new electricity market. These new market arrangements integrate the all island electricity market with European electricity markets, making optimal use of cross border transmission assets. Ireland operates three operational HVDC interconnectors: Moyle, East-West, and Greenlink and one in development Celtic interconnector which connect Ireland to Scotland, Wales, and France respectively. Irish market operator, EirGrid, can maximize their operational profit by using the price difference in these electricity markets. We propose a profit maximization modelling which considers the line losses and price difference in these different electricity markets and identifies the optimal import/export of power using HVDC interconnectors. These models in future should incorporate the distribution losses, renewable energy curtailment, and Irish power network congestion levels. The proposed modeling is the first step towards implementing a multi-objective HVDC interconnector operating strategy.

Related