vix.ing · top · new · best · stats · spec

Status of the warm front end of PXIE

2015/02/05 by A. Shemyakin, Shemyakin, A., M. Alvarez +27
Engineering · Physics and Astronomy · #Accelerator Physics (physics.acc-ph) #Calibration and Measurement Techniques #FOS: Physical sciences #physics.acc-ph

paper · pdf · doi:10.48550/arxiv.1502.01703

3 pp

arxiv created 2015/02/05 · openalex publication_date 2015/02/05 · arxiv updated 2015/02/06 · openalex created_date 2025/10/10 · openalex updated_date 2026/08/01

Abstract

A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.

Citations

Related