vix.ing · top · new · best · stats · spec

Product-specific and early-staged determination of production space needs

2024/10/15 by Kuthe, Jona, Alieksieiev, Volodymyr, Jansen, Tim Maximilian +3
#Arbeitsorganisation #Fabrikplanung #Maschinenbau #Technology::600: Technology

paper · doi:10.15480/882.13422

Abstract

Dynamic markets, scarce space, and increasing automation reshaped the conditions for factory planning and reduced the applicability of established methods. Especially in the early phase of factory planning, a reliable estimate of space requirements based on incomplete information is necessary. This article presents a method for determining space needs in piece goods production and validates it using the example of aircraft industry.

Related