2025/05/05 by Xavier Allamigeon, Allamigeon, Xavier, Pascal Capetillo +3
Health Professions · #FOS: Mathematics #Healthcare Operations and Scheduling Optimization #Optimization and Control (math.OC)
paper · pdf · doi:10.48550/arxiv.2505.02729
openalex publication_date 2025/05/05 · openalex created_date 2025/10/10 · openalex updated_date 2026/07/28
Medical emergency departments are complex systems in which patients must be treated according to priority rules based on the severity of their condition. We develop a model of emergency departments using Petri nets with priorities, described by nonmonotone piecewise linear dynamical systems. The collection of stationary solutions of such systems forms a "phase diagram", in which each phase corresponds to a subset of bottleneck resources (like senior doctors, interns, nurses, consultation rooms, etc.). Since the number of phases is generally exponential in the number of resources, developing automated methods is essential to tackle realistic models. We develop a general method to compute congestion diagrams. A key ingredient is a polynomial time algorithm to test whether a given "policy" (configuration of bottleneck tasks) is achievable by a choice of resources. This is done by reduction to a feasibility problem for an unusual class of lexicographic polyhedra. Furthermore, we show that each policy uniquely determines the system's throughput. We apply our approach to a case study, analyzing a simplified model of an emergency department from Assistance Publique - Hôpitaux de Paris.