vix.ing · top · new · best · stats · spec

Flexible job-shop scheduling considering human performance fluctuations

2017/11/27 by Henrik Prinzhorn, Prinzhorn, Henrik, Christian Böning +3
Decision Sciences · Engineering · #Ingenieurwissenschaften (DDC 620) #Resource-Constrained Project Scheduling #Scheduling and Optimization Algorithms #Scheduling and Timetabling Solutions #error costs #flexible job-shop scheduling #human performance fluctuation #memetic algorithm

paper · doi:10.2195/lj_notrev_prinzhorn_en_201710_01

openalex created_date 2017/11/10 · openalex publication_date 2024/12/16 · openalex updated_date 2026/07/01

Abstract

In production, product-related error costs can be reduced by focusing on human production factors, such as considering human performance fluctuations during the day, when production planning with respect to job-shop scheduling. In this article, the flexible job-shop scheduling problem is extended by considering product-related error costs and logistic costs. Product-related error costs are increased by over stressing the operative workers. Logistic costs are based on work in process and throughput time. This cost-based definition enables a production plan to be simultaneously optimized in respect of both error and logistic costs. The product-related error costs and flexible job-shop scheduling problem are described mathematically and a memetic algorithm is also presented as an approach. Within the memetic algorithm, the evolutionary process is supplemented with a local search procedure to improve the ability of solutions and repair procedures to rectify infeasible solutions. The influence of product-related error costs on the total costs of a produc-tion plan, throughput and job waiting times within job-shop scheduling is presented.

Related