vix.ing · top · new · best · stats · spec

Design of Muon Campus full flow purifier for varying operational conditions and horizontal shipping

2023/08/29 by J. Subedi, Subedi, J., T. Tope +11
Engineering · #FOS: Physical sciences #Instrumentation and Detectors (physics.ins-det) #Muon and positron interactions and applications #Particle accelerators and beam dynamics #Superconducting Materials and Applications

paper · pdf · doi:10.48550/arxiv.2308.15616

openalex publication_date 2023/08/29 · openalex created_date 2025/10/10 · openalex updated_date 2026/08/01

Abstract

Constant ingress of impurities in Muon Campus g-2 experiment at Fermilab has resulted in reduction of efficiency of cryogenic expanders and occasional undesired downtime to flush the impurities. Due to insufficiency of current 60 g/s mobile purifier, a full flow purifier is designed to be used in Muon Campus which purifies 240 g/s of Helium throughput of 4 compressors through charcoal bed at 80 K and returns ambient Helium back to the system. The purifier is designed to be operated near liquid Nitrogen temperature during cold operations and up to 400 K during regeneration. Both warm and cold operational range of the purifier has required use of appropriate clearances in design due to expansion and contraction. The vessel of around 16 ft height which is designed to be operated vertically is to be shipped horizontally. The asymmetrical position of heavy stainless steel heat exchanger in the purifier support frame and 5g vertical load design consideration for shipping has required use of shipping supports and heat exchanger rotational stops to comply with design requirements. FEA of purifier system is performed in cold, warm and shipping cases to verify that the purifier satisfies the design requirements.

Related