vix.ing · top · new · best · stats · spec

Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab

2012/08/09 by Mike McGee, J. Leibfritz, McGee, M. W. +7
Engineering · Physics and Astronomy · #Accelerator Physics (physics.acc-ph) #FOS: Physical sciences #Particle Accelerators and Free-Electron Lasers #Particle Detector Development and Performance #Particle accelerators and beam dynamics

paper · pdf · doi:10.48550/arxiv.1208.2018

openalex publication_date 2012/08/09 · openalex created_date 2025/10/10 · openalex updated_date 2026/07/28

Abstract

The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule #1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.

Related