2018/12/04 by A. Robson, Aidan Robson, P. Roloff +3 · 1 citation
Engineering · Physics and Astronomy · #FOS: Physical sciences #High Energy Physics - Experiment (hep-ex) #High Energy Physics - Phenomenology (hep-ph) #Particle Accelerators and Free-Electron Lasers #Particle Detector Development and Performance #Particle physics theoretical and experimental studies #hep-ex #hep-ph
paper · pdf · doi:10.48550/arxiv.1812.01644
9 pages, 6 figures
arxiv created 2018/12/04 · openalex publication_date 2018/12/04 · arxiv updated 2018/12/06 · openalex created_date 2018/12/11 · openalex updated_date 2026/07/28
An updated luminosity staging baseline for CLIC is presented. Assuming accelerator ramp-up and up-time scenarios that are harmonized with those of other potential future colliders, CLIC will deliver 1 ab-1 at sqrt(s)=380 GeV, 2.5 ab-1 at sqrt(s)=1.5 TeV, and 5 ab-1 at sqrt(s)=3 TeV. The complete programme will take 25-30 years. The baseline scenario for luminosity sharing between the two electron beam polarisation states is also discussed. Updated Higgs coupling sensitivities are given for this new luminosity staging baseline.